This chapter describes how to install the IBM High-Speed 100/16/4 Token-Ring PCI Management Adapter.
Your adapter comes configured from the factory with RPL/PXE and expansion ROM enabled.
Before you begin to install this adapter, be sure to read Safety Information.
To install your adapter, perform the following procedure:
Note: | In the U.K., by law, telephone line cables must be disconnected from the PC before the power cord. |
Note: | If you will be using the Wake on LAN feature, then depending on the orientation of the adapter to your computer, you might need to connect the Wake on LAN cable to your adapter before inserting the adapter into the slot in your computer. |
Note: | In the U.K., by law, the power cord must be connected before the telephone line cable. |
To install the cable, perform the following steps:
Figure 1. Connecting the Wake on LAN cable to the system board (3-pin connector)
Figure 2. Connecting the 2-way combined Wake on LAN cable to the adapter
Note: | In the U.K., by law, the power cord must be connected before the telephone line cable. |
To connect your adapter to a token-ring network, you will need one of the cables shown in Figure 3. These cables are not included with the adapter.
The network end of the cable must be compatible with the network faceplate or other device to which the adapter will be connected.
Note: | No more than one data cable may be connected to the adapter at a time. |
Your adapter uses cables from group II (category 5 or better) or cables from group III. You cannot use cables from group I. You cannot use the combination of a conversion cable (PN 60G1066) with a cable from group III.